Case Study Example

“A West Texas operator needed to drill a horizontal well in the Cline Shale.  Previous attempts had taken 30 days or longer and required sliding more than 30% of the time.  By utilizing a properly-stabilized BHA and the Down Hole Vibrating (DHV) Tool, the operator was able to accomplish a similar well in less than 25 days while sliding less than 17% of the time.”